NOTICE OF STUDY COMMENCEMENT
Municipal Class Environmental Assessment
Mississauga Road (rr # 1) Improvements From North of Olde Base Line Road to Bush Street and Bush Street (rr#11) From Mississauga Road to East of Winston Churchill Boulevard

The Study

The Regional Municipality of Peel has initiated a Municipal Class Environmental Assessment for reconstruction and improvements on Mississauga Road (Regional Road 1) from north of Olde Base Line Road to Bush Street and Bush Street from Mississauga Road to east of Winston Churchill Boulevard including Belfountain. The approximate limits of the study area are illustrated on the map.

Mississauga Road is currently a two lane rural road. The study will examine the need and feasibility of reconstruction, changes to road and intersection geometrics and pavement rehabilitation to address issues related to operational deficiencies and storm drainage. The study is not considering increasing the number of lanes on Mississauga Road and Bush Street

The Process

The study is being conducted in accordance with the approved requirements for a Schedule C project as described in the Municipal Engineers Associations Municipal Class Environmental Assessment (EA) document (October 2000, as amended in 2007). The Class EA process will include public review and agency consultation, an evaluation of road improvement alternatives, an assessment of the potential environmental effects of the proposed improvements, and identification of reasonable measures to mitigate any adverse impacts.

Public Open House

Public Consultation

Public consultation is vital to the success of this study and we want to ensure that anyone interested in this study has the opportunity to get involved and provide input. The Region plans to hold two Public Information Centres (PICs) during the study. The PICs will provide background information on the study, comparative analysis of various alternatives and design concept, and the technically preferred alternative and design concept. Representatives from the Region will be present at the PICs to answer questions about the study. Notifications will be provided at the appropriate times by means of a similar advertisement.

Upon completion of the study, an Environmental Study Report will be submitted to the Ministry of the Environment and made available for public review for a period of 30 days. Subject to comments received and the receipt of necessary approvals, the Region intends to proceed with the detailed design and construction of this project.

Comments and Information

Please visit our website www.peelregion.ca for updates on the project. To provide comments or request additional information about this project, please contact either of the following team members:

Mr. Jaime Acosta, P.Eng
Supervisor, Project Planning and Studies
Regional Municipality of Peel
9445 Airport Road, 3rd Floor
Brampton, ON L6S 4J3
Telephone: 905-791-7800 ext. 7830
Fax: 905-791-1442
Email: Jaime.acosta@peelregion.ca

Ms. Solmaz Zia, P.Eng
Project Manager, Project Planning
and Studies

Regional Municipality of Peel
9445 Airport Road, 3rd Floor
Brampton, ON L6S 4J3
Telephone: 905-791-7800 ext. 7845
Fax: 905-791-1442
Email: solmaz.zia@peelregion.ca   

 

Information will be collected in accordance with the Municipal Freedom of Information and Protection of Privacy Act. With the exception of personal information, all comments will become part of the public record.